As part of all construction projects, Building Control Applications must be made and signed off for the project to be considered complete.

 

At J P Elliott, we work on either the client, or the contractor's behalf to produce all relevant information, documentation and certification required for building control approval. 

 

This typically includes two stages of approval; the first stage is the production of building control detailed drawings, which J P Elliott will provide. Once approved, the second stage then includes the on-site inspections and correspondence with building control. This is something that can be carried out by either the contractor on site or as part of our Project management services, J P Elliott will provide this service. 

 

Once appointed to carry out the Building Control production, our duties will include;

 

  • Production of building regulations compliant drawings, including any necessary plans, elevations, details, sections, notes and documentation all relevant to the appropriate building standards and regulations.

 

  • Obtaining a quotation for the services of an approved building inspector or local authority building control for the client’s fee reference.

 

  • Submitting the building regulations package for plan assessment only. 

 

  • Liaising with both building control and the client in order to achieve compliance with building regulations while adhering to the client brief.

     

     

     

     

     

     

     

Building Control Applications

  • Wix Facebook page
  • Wix Twitter page
  • Wix Google+ page

6 Lone Eagle Close, 

Southampton, SO19 6AR

 

www.jpelliottarchdesign.com

Tel:       +44 (0)7712174869

Email:   jpelliott.archdesign@hotmail.com